Betekenis van:
running board
running board
Zelfstandig naamwoord
- a narrow footboard serving as a step beneath the doors of some old cars
Hyperoniemen
Voorbeeldzinnen
- ‘Unladen mass’ means the mass of the vehicle in running order without driver, passengers or load, but with the fuel tank 90 per cent full and the usual set of tools and spare wheel on board, where applicable;
- The delays in restructuring ABX are to a large extent the result of continued interference by SNCB in the daily running of ABX and the fact that members of ABX's board of directors are appointed for political reasons.
- ‘Unladen mass’ means the mass of the vehicle in running order without driver, passengers or load, but with the fuel tank 90 per cent full and the usual set of tools and spare wheel on board, where applicable;
- ‘participation in the capital with rights or representation on the board of directors, supervisory board or any other governing body of a system vendor’ means an investment to which are attached rights or representation on the board of directors, supervisory board or any other governing body of a system vendor, and conferring the possibility of exercising, alone or jointly with others, decisive influence on the running of the business of the system vendor;
- It is allowed to use existing Class B equipment on-board as a fallback arrangement to Class A system: this does not allow an infrastructure manager to require Class B systems onboard the interoperable trains for running on such a line.
- Vehicles of category M1, other than vehicles whose maximum mass exceeds 2500 kg, and N1 class I, running permanently or part-time on either LPG or NG fuel shall be equipped with on-board diagnostic system from 1 October 2004 for new types and from 1 July 2005 for all types.
- On a line equipped with ETCS and/or GSM-R, additional Class B equipment is possible in order to allow the operation of rolling stock not compatible with Class A during the migration phase. It is allowed to use existing Class B equipment on-board as a fallback arrangement to Class A system: this does not allow an infrastructure manager to require Class B systems onboard the interoperable trains for running on such a line.